Real Estate & Construction
Infrastructure for developers who deliver on handover dates.
Cabling, security, power and technology infrastructure delivered to programme, phase by phase, without becoming the reason the date slips.
What this sector demands
The date governs everything
Technology infrastructure is usually one of the last packages on site and the first to get squeezed when the programme tightens. We plan for that rather than discovering it in month nine.
Buildings hand over in stages
The first tenant occupies while the third is still a shell. Anything designed only for the finished state fails the first two years of the building's life.
The operator inherits whatever exists
Whoever runs the building afterwards gets the documentation you hand them. If the drawings do not match the building, that is their problem for the next twenty years.
What we do here
Why CoreLink here
- We plan around phased handover rather than assuming a single completion
- We coordinate with MEP and main contractor early, because containment routes are decided long before we are usually invited
- We test and certify every point, so the operator inherits evidence rather than assurances
- Our as-built documentation is the pack the facility team will still be using in ten years
- We can hold the whole technology scope, or take one package and integrate cleanly with the rest
Standards and suppliers
We name the standard we build to, in writing. These are the ones this sector asks about most.
Final standards list to confirm with Engineering.
Suppliers we use in this sector







Projects in this sector
Project cards land here once the Project Data Request comes back from Engineering.
Other sectors we work in
Send us the programme.
Tell us where technology sits in it and what the handover milestones are. We will come back with a phasing plan that fits, not one that fights it.

